Staller 3216, 3218, 3220

Staller 3rd floor was a big project.  The designer of this project was able to combine all 3 rooms into on spot for them to be controlled from. The update on these rooms were completed by Fall 2023.  

For more information on room functionality please visit Classroom Technology website

Before Construction


Classroom

Taken from the front of the room

Classroom

A before picture taken from the back of the room

During Construction


Classroom

This is an empty room with the new equipment about to be installed

Rack

This space between 3220 & 3218 that will control all three rooms

After Construction

Rack Room between 3220 - 3218


Equipment Rack Front

Front end of a completed equipment rack that controls all 3 rooms

Equipment Rack Back

Back end of a completed equipment rack that controls all 3 rooms

Classroom Lectern

Back of the classroom of 3220

Classroom Lectern

New height adjustable lectern that meets todays standards

Classroom Lectern

Front of the classroom 3220

Classroom

Taken from the back of classroom 3216

Media Station

New media station in classroom 3216

Classroom

Taken from the back of the classroom 3218

Media Station

New media station in classroom 3218


Planning documentation

Sample BOM

Sample "Build of Materials" (BOM) for Staller

Sample Wiring Diagram

Sample "Wiring diagram" that was done in house by MSE staff