Staller 3rd floor was a big project. The designer of this project was able to combine all 3 rooms into on spot for them to be controlled from. The update on these rooms were completed by Fall 2023.
For more information on room functionality please visit Classroom Technology website
Before Construction
Taken from the front of the room
A before picture taken from the back of the room
During Construction
This is an empty room with the new equipment about to be installed
This space between 3220 & 3218 that will control all three rooms
After Construction
Rack Room between 3220 - 3218
Front end of a completed equipment rack that controls all 3 rooms
Back end of a completed equipment rack that controls all 3 rooms
Back of the classroom of 3220
New height adjustable lectern that meets todays standards
Front of the classroom 3220
Taken from the back of classroom 3216
New media station in classroom 3216
Taken from the back of the classroom 3218
New media station in classroom 3218
Planning documentation
Sample "Build of Materials" (BOM) for Staller
Sample "Wiring diagram" that was done in house by MSE staff